IFA Group Manufacturing Plant Expansion

IFA Group Manufacturing Plant Expansion
IFA Group Manufacturing Plant Expansion
IFA Group Manufacturing Plant Expansion
IFA Group Manufacturing Plant Expansion
IFA Group Manufacturing Plant Expansion
IFA Group Manufacturing Plant Expansion
IFA_Expansion_2020_06_4326
IFA_Expansion_2020_06_4366
IFA_Expansion_2020_06_4414
IFA_Expansion_2020_06_4381
IFA_Expansion_2020_06_4324
IFA_Expansion_2020_06_4318
previous arrowprevious arrow
next arrownext arrow

After working out of the recently built Module 1 and 2 facility In the Charleston Trade Center for the last three years, IFA was ready to undertake Module 3 of their plan to bring all their manufacturing facilities in the Charleston area under one roof. The existing 233,300 SF facility was expanded by an additional 211,300 SF. Simultaneously, the existing 17,000 SF second floor office expansion space is fully upfitted to bring the total amount of office space to 34,000 SF and the total usable building floor area to 461,600 SF.

Designed with load-bearing tilt-wall concrete construction to minimize steel cost, the building utilizes knockout panels provided in the previous phases to allow the Module 3 manufacturing expansion to have direct access to the existing warehouse and shipping area. Large open office areas accommodate IFA’s desire to have all their production and management teams under one roof. A large training room and a second, larger cafeteria augments the existing one. Partnering with Frampton Construction and developer, The Keith Corporation, in a design-build delivery, the project began construction in the early Fall of 2019 and was completed in Summer of 2020.