Mosack Group, Logistics + Manufacturing Warehouse
McMillan Pazdan Smith’s industrial team was asked to design a new logistics and manufacturing warehouse for Mosack Group. The facility stores pipe fittings, Pex tubing, plumbing tools, and more to help accommodate the increasing demand for a potable water solution. The secondary function includes a manufacturing line for Pex fittings.
For a total of 131,974 SF, the first floor of the facility includes a 106,600 SF warehouse, a 16,076 SF manufacturing line, and 3,343 SF of office space. The mezzanine level includes 5,955 SF of additional office space overlooking the warehouse. Interior features include 10 dock doors; one, 12’x14′ drive-in door; five knockout dock doors for future use; 50’x50′ bay sizes and column spacing; and a 32′ clear height. The building is constructed using tilt-up methods with a 45-mil TPO roof on rigid insulation.