Our Lady of Lourdes Exterior Evening
Our Lady of Lourdes Sanctuary Lower
Our Lady of Lourdes Sanctuary
Our Lady of Lourdes Details Collage
Our Lady of Lourdes Exterior Front
Our_Lady_of_Lourdes_Church-Greenwood_Exterior
Our_Lady_of_Lourdes_Church-Greenwood_Interior2
Our_Lady_of_Lourdes_Church-Greenwood_Interior
Our_Lady_of_Lourdes_Church-Alter_and_Doors
Our_Lady_of_Lourdes_Church-Exterior_Front
previous arrowprevious arrow
next arrownext arrow

Our Lady of Lourdes Catholic Church

Serving the Aiken Deanery of the Diocese of Charleston, Our Lady of Lourdes Catholic Church asked McMillan Pazdan Smith to provided a Master Plan study for their campus located in Greenwood, SC. This study led to a successful fundraising phase. The initial project included a 12,000 SF church, designed with the flexibility to expand from 800 to 1,200 seats.  As the focal point of the campus, the church included large gathering spaces and direct access to the adjacent activities building. The design team was able to separate vehicular and pedestrian traffic by routing vehicular traffic around the perimeter of the site. Defined walkways link the buildings together. Phase II included an activities building, offices, and a classroom building.